Please ensure Javascript is enabled for purposes of website accessibility

Gleneagles Reserve Stormwater Management & Reserve Upgrade

Gleneagles Reserve in Seaton is being transformed through two key stages:

  1. Stormwater Management Upgrade (Completed)
  2. Reserve Upgrades for community access and recreation (Commencing October 2025)

Stage 1: Gleneagles Reserve Stormwater Management Upgrade

We’ve upgraded the stormwater system at Gleneagles Reserve to better manage heavy rain and flooding, while improving the reserve for future community use.

This project is jointly funded by the City of Charles Sturt, Stormwater Management Authority (Government of South Australia) and Disaster Ready Fund (Australian Government).

Why the upgrade is needed:

Heavy rainfall can overwhelm our stormwater system, flooding homes, streets, and parks. This upgrade will allow us to capture and manage more stormwater safely and efficiently, reducing flood risk now and into the future. By investing in this system now, we can prevent future damage, protect our community, and avoid costly repairs later.

You can learn more about Stormwater Management in our City here.

Key project details:

  • A larger and deeper stormwater detention basin
  • A new pump station to return water to the drain within 24–48 hours after a storm
  • Strong, rock-filled vertical gabion walls to hold more water
  • A large stormwater pit and weir to divert high flows into the basin
  • Realigned car park entrance at Ailsa Avenue and removal of a dirt mound to increase stormwater capacity
  • Removal of the old basketball ring
  • A greener, safer space: More than 200 new trees will be planted around the basin, resulting in a net gain of 35 trees. These plantings will make the area greener, cooler, and more pleasant for everyone to enjoy.

Gleneagles Reserve Plan can be viewed here.

Timeline of Stormwater Management Upgrade:

May 2024Contract awarded.
June 2024Project construction begins.
July 2025 - CompletedThe stormwater mitigation works completed. Hyrdroseeding will be undertaken when weather conditions are suitable.
August - HydroseedingThe basin will be hydroseeded when weather conditions are suitable. To support grass establishment, temporary fencing or other barriers may be in place for approximately 8–10 weeks.

Take a look at our timelapse video showcasing the stormwater management upgrade:

Stage 2: Reserve Upgrade

Community consultation helped shape a clear vision for Gleneagles Reserve. In response, around $600,000 was committed to deliver upgrades aligned with local priorities.

Key project details:

  • A new single-use, automated, secure toilet facility
  • Two picnic shelters with seating
  • An electric BBQ
  • A new shade sail over the play space
  • Turf and landscaping enhancements
  • Accessible pedestrian entries and a new connecting pathway through the reserve

Timeline of Reserve Upgrade:

October 2025Reserve upgrade construction commenced.
March 2026 Works completed (pending drinking fountain).  

Previous Consultation

This initiative comes after consultations held in 2022 and a recent community update in November 2023. To read more about the Community Consultation to date, please visit our dedicated community engagement site Your Say Charles Sturt.